Repairing a Cooling tower is often complicated and full of surprises too. It starts with identifying the basic work that need to be done. During the identification of scope details discovered can be horrible enough then the work done. When these horrible issues arise, the every repair team must work together. To handle and resolve issues, the project team should includes owner, cooling tower design engineer, cooling tower project manager and skilled or non-skilled construction staff so that unnecessary costs can be avoided and well formed engineering solutions are provided within the time span.

It is a must for repairing team owner to make collaboration with consultants/suppliers to collect the detailed scope of work to repair the damaged cooling tower. Despite of everything, once the repair work begins on site, a common problem may occur i.e. the state of components that could not have been identified during planning stage due to certain reasons. 

Cooling tower owners must also be careful about the Vendor selection to complete the cooling tower repairing work. Owner must identify that if applied work via vendor has real engineering skills and resources or are they simply doing what they think by their own? 

We at Wetpoint get difference on that part. We have seen numerous cases and understands where cooling towers were modified without regard of structural engineering best practices. When this happens, the cooling tower compromised with the equipment that results decreased performance and low output. Some times the chance of a cooling tower shut down increased.

So don’t let this happen in your plant/factory. Call our Wetpoint cooling tower service team today and let us help you design and manage your cooling tower project.